3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment

Customization: Available
Type: Coating Production Line
Coating: PE

Products Details

Basic Info.

Model NO.
32-1220mm
Pipe Application
Oil & Gas Pipe
Coating Structure
Epoxy+Adhesive+Extruded PE
Transport Package
Plastic Film and Wooden Pallet
Specification
32-1220mm
Trademark
HSD
Origin
Qingdao, China
HS Code
8477209000
Production Capacity
15sets/Year

Product Description

3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment
Description
3PE Anticorrosion coating processing line is to make 3 layer anti-corrosion coating for kinds of steel pipes.
3 layer coatings, first FBE coating, the middle is an adhesive layer, outside the polyethylene layer.

3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment


3PE can strengthen the pipeline's mechanical properties, high electrical resistance, waterproof, wearable, anti-aging.
3PE coating/coated steel pipes are widely used in pipeline systems for the transmission of oil, gas, water, and other fluids. They have high resistance to corrosive from chemicals, moisture, harmful environment, etc.
3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment




The line includes systems of steel pipe transportation, surface disposal, dust catching, pipe heating, electrostatic spraying, coating, water cooling, edge cutting, hydraulic and pneumatic device, detecting and electric controlling system. 




.
Technological processes
Upload pipespipes screw conveyorrust removal of intermediate frequency heatingEpoxy powder coatingouter layer soli quid & polyethylene coatingcooling spraypipes screw conveyorgrinding pipes, sendunload pipes

3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment




Main Equipment of 3PE anticorrosion processing
Configuration List

No. Name Set
A. Derusting Equipment                                          
1 Pipe-conveying Equipment 1
2 Shot Blast Cleaning Machine 1
3 Cyclone Dust Collector 1
4 Pulse dust collector 1
5 Centrifugal exhaust fan 1
6 Rust removal equipment PLC 1
B. Coating equipment
1 Coating transfer equipment 1
2 IF heating device 1
3 Powder spraying device 1
4  Automatic loading dryer 2
5 SJ-65/30 Extruder 1
6 SJ-180/30 Extruder 1
7 Hot melt adhesive extruder die 1
8 PE sheet extruder head mold 1
9 Hot melt adhesive/PE sheet coating device 1
10 Environmental Protection Ventilation equipment 1
11 Cooling Spray equipment 1
C.Platform Equipment
1 Steel pipe platform 1
2 Post-rust removal transition platform 1
3 Product tube storage platform 1
4 Hydraulic Equipment 3
D.Groove Equipment
1 PE Beveling Machine 2
2 Hydraulic Lifting and Turning Machinery 1
3 Hydraulic Equipment 1
4 PLC 1
E.Compressed air Equipment
1 Screw Air Compressor 1
2 Cold dry machine 1
3 Precision filters 3
4 Gas tanks 1

3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment
3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment
3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment





Question & Answer:
Q1. What is the range of pipe diameter the equipment can produce?
A: Diameter of steel Pipe: 48-219mm,219-1220mm,800-1600mm,1000-2400mm
Q2. What is the sand blasting grade?
A:SA2.5
Q3. What is your anti-corrosion coating standard?
A: It can meet  SY/T0413-2002 ,GB/T23257-2009, German DIN 30670 , DIN 30678 and  coating specification requirements from American Corrosion Association, and DNV . The product pipe fully complies with  SY/T0315-2005 ,CNPC38-2002 "Technical specifications for double-layer fusion-bonded epoxy powder coating on buried steel pipe and Canada, American Corrosion Association standards.
Q4. What is Delivery Time?
A: 2-3monthes after deposit.
Q5. Production output 
A: It is different output capability as different pipe diameter, the Max. is 3 to 8 km/day, and annual processing capacity is 2 million square meters (Φ508 mm).
Q6. Coating thickness: 
A: 80~800um
Q7. To which country did you sell your 3PE equipment?
A. We have produced nearly 50sets 3PE processing line at home and abroad. Such as Russia, Iran, UAE, Iran, India, Belarus, Kazakhstan and so on.
Q8. After-sales service: 
A:  Warranty period:
Before delivery all the equipment must be trial operated  to confirm the quantity perfectly.
The warranty period is 12 months from the date of pick-up for mechanical part , and 6 months  for the electrical part.
Service:
The seller provides technical services and provides training and guidance to buyer operators.
Our factory
3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment


Our team
3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment


Workshop
3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment


Customer visiting
3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment


Delivery
3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment


Exhibition
3PE/Three Layer PE Steel Pipe Anti Corrosion Epoxy Powder Coating/PE Wrapping Line/Equipment

 

    Hot Tags: 3PE-Steel-Pipe-Anti-Corrosion-Production-Line 3Layer-PE-Steel-Pipe-Coating-Line 3PE-Steel-Pipe-Anticorrosive-Making-Line 3Layer-PE-Steel-Pipe-Anti-Corrosion-Processing-Line 3Layer-PE-Steel-pipe-production-Line 3PE-Coating-Line

    Contact us

    Please feel free to give your inquiry in the form below We will reply you in 24 hours